Role of site engineer

ROLE OF CONSTRUCTION SITE ENGINEER



  •  Role of Construction Site Engineer depends on the type of work involved and experience of site engineer in a construction project. The duties and responsibilities of a construction site engineer are typically as follows, many of these will be delegated to other engineers on the site according to their experience and ability


  • Setting out the works in accordance with the drawings and specification
  • Liaising with the project planning engineer regarding construction programmes
  • Checking materials and work in progress for compliance with the specified requirements
  • Observance of safety requirements
  • Resolving technical issues with employer’s representatives, suppliers, subcontractors and statutory authorities
  • Quality control in accordance with CSIs/procedures method statements, quality plans and inspection and test plans, all prepared by the project management team and by subcontractors
  • Liaising with company or project purchasing department to ensure that purchase orders adequately define the specified requirements
  • Supervising and counselling junior or trainee engineers
  • Measurement and valuation (in collaboration with the project quantity surveyor where appropriate)
  • Providing data in respect of variation orders and site instructions
  • Preparing record drawings, technical reports, site diary
  • Job review of subordinate staff

Comments

Popular posts from this blog

Hardy slab and where it use

  HARDY SLAB :- These kind of slabs are generally seen in Dubai and China. This  slab is constructed by hardy Bricks. Hardy bricks are hollow bricks and made up of concrete Hollow blocks are used to fill portions of the slab thickness it saves the  amount of concrete and hence the own weight of the slab is reduced. This kind of slab has a more thickness when compared with the conventional one. The thickness of hardy slab is 0.27m. The method of installing Hardy slab is different from normal  and it is clearly explained below: This is a one of the types of concrete slabs. The dimensions of Hardy brick is 40cm x 20cm x 20cm The process of execution is as follows: Step 1   : Formwork is arranged and then shutters are fixed on the formwork. Step 2  : Hardy blocks are placed on the shutter with one brick gap on the entire shutter. Step 3  : The gaps between the bricks are called as rib. Reinforcement is provided in a form of beam within the gap. Step 4  : After placing the

About Dome,Pitch roof,Arches slab

Dome Slab:- These kind of slab is generally constructed in temples, Mosques, palaces etc. And Dome slab is built on conventional slab. Thickness of Dome slab is 0.15m. Domes are in semi circle and shuttering is done on conventional slab in dome shape and concrete is filled in shuttering forming dome shapes. This is a one of the types of concrete slabs. PITCH ROOF SLAB: Pitch roof is an inclined slab , generally constructed on resorts for a natural look. Compared to traditional roofing materials Tile-sheets used in pitch roof slab  are extreamely lightweight. This weight saving reduces the timber or steel structural requirements resulting in significant cost savings.Tile-sheets are tailor made for each project offering labour cost savings and reduced site wastage. And the thickness of slab is depends on the tiles we using it may be 2″-8″. This is a one of the types of concrete slabs. Advantages : 1. It sheds off rain water better. 2. It gives you internal storage or ro

About slump cone test in concrete

Concrete Slump Test for Workability -Procedure and Results. Concrete slump test is to determine the workability or consistency of concrete mix prepared at the laboratory or the construction site during the progress of the work. Procedure for Concrete Slump Test: Clean the internal surface of the mould and apply oil. Place the mould on a smooth horizontal non- porous base plate. Fill the mould with the prepared concrete mix in 4 approximately equal layers. Tamp each layer with 25 strokes of the rounded end of the tamping rod in a uniform manner over the cross section of the mould. For the subsequent layers, the tamping should penetrate into the underlying layer. Remove the excess concrete and level the surface with a trowel. Clean away the mortar or water leaked out between the mould and the base plate. Raise the mould from the concrete immediately and slowly in vertical direction. Measure the slump as the difference between the height of the mould and that of height poin