Elements of a building

Elements of a Building
The following are the basic elements of a building:
1. Foundation
2. Plinth
3. Walls and columns
4. Sills, lintels and chejjas
5. Doors and windows
6. Floors
7. Roofs
8. Steps, stairs and lifts
9. Finishing work
10. Building services.
The functions of these elements and the main requirement of them is presented in this article.
1. Foundation: 
Foundation is the most important part of the building. Building activity starts with digging the ground for foundation and then building it. It is the lower most part of the building. It transfers the load of the building to the ground. Its main functions and requirements are:
(a) Distribute the load from the structure to soil evenly and safely.
(b) To anchor the building to the ground so that under lateral loads building will not move.
(c) It prevents the building from overturning due to lateral forces.
(d) It gives level surface for the construction of super structure.
2. Plinth: 
The portion of the wall between the ground level and the ground floor level is called
plinth. It is usually of stone masonry. If the foundation is on piles, a plinth beam is cast to support wallabove floor level. At the top of plinth a damp proof course is provided. It is usually 75 mm thick plainconcrete course.
The function of the plinth is to keep the ground floor above ground level, free of dampness. Itsheight is not less than 450 mm. It is required that plinth level is at least 150 mm above the road level, so
that connections to underground drainage system can be made.
3. Walls and Columns: 
The function of walls and columns is to transfer the load of the structure
vertically downwards to transfer it to foundation. Apart from this wall performs the following functions
also:
(a) It encloses building area into different compartments and provides privacy.
(b) It provides safety from burglary and insects.
(c) It keeps the building warm in winter and cool in summer.
4. Sills, Lintels and Chejjas: 
A window frame should not be directly placed over masonry. It is placed over 50 mm to 75 mm thick plain concrete course provided over the masonry. This course is called as sill. Lintels are the R.C.C. or stone beams provided over the door and window openings to transfer the load transversely so as to see that door or window frame is not stressed unduly. The width of lintels is equal to the width of wall while thickness to be provided depends upon the opening size.
Chejja is the projection given outside the wall to protect doors and windows from the rain. They are usually made with R.C.C. In low cost houses stone slabs are provided as chejjas. The projection of
chejja varies from 600 mm to 800 mm. Sometimes drops are also provided to chejjas to improve acsethetic look and also to get additional protection from sun and rain.
5. Doors and Windows: 
The function of a door is to give access to different rooms in the building and to deny the access whenever necessary. Number of doors should be minimum possible.
The size of the door should be of such dimension as will facilitate the movement of the largest object likely to use the door.
Windows are provided to get light and ventilation in the building. They are located at a height of 0.75 m to 0.9 m from the floor level. In hot and humid regions, the window area should be 15 to 20 per cent of the floor area. Another thumb rule used to determine the size and the number of windows is for every 30 m3 of inside volume there should be 1 m2 window opening.
6. Floors: 
Floors are the important component of a building. They give working/useful area for the occupants. The ground floor is prepared by filling brick bats, waste stones, gravel and well compacted with not less than 100 mm sand layer on its top. A lean concrete of 1 : 4 : 8, 100 mm thick is laid. On this a damp proof course may be provided. Then floor finishing is done as per the requirement of the owner.
Cheapest floor finish for a moderate house is with 20 to 25 mm rich mortar course finished with red oxide. The costliest floor finish is mossaic or marble finishing.
Other floors are usually of R.C.C. finished as per the requirements of the owner.
7. Roof:
Roof is the top most portion of the building which provide top cover to the building. It
should be leak proof.
Sloping roof like tiled and A.C. sheet give leak proof cover easily. But they do not give provision
for the construction of additional floor. Tiled roof give good thermal protection.
Flat roofs give provision for additional floors. Terrace adds to the comfort of occupants. Water
tanks can be easily placed over the flat roofs.
8. Step, Stairs and Lifts: 
Steps give convenient access from ground level to ground floor level.
They are required at doors in the outer wall. 250 to 300 mm wide and 150 mm rise is ideal size for
steps. In no case the size of two consecutive steps be different. Number of steps required depends upon
the difference in the levels of the ground and the floor. Stairs give access from floor to floor. They
should consists of steps of uniform sizes.
In all public buildings lifts are to be provided for the conveniences of old and disabled persons.
In hostels G + 3 floors can be built without lifts, but in residential flats maximum floors permitted
without lifts is only G + 2. Lift is to be located near the entrance. Size of the lift is decided by the
number of users in peak hours. Lifts are available with capacity 4 to 20 persons.
9. Finishing: 
Bottom portion of slab (ceiling), walls and top of floor need smooth finishing
with plaster. Then they are provided with white wash, distemper or paints or tiles. The function of
finishing work is:
(a) Give protective cover
(b) Improve aesthetic view
(c) Rectify defective workmanship
(d) Finishing work for plinth consists in pointing while for floor it consists in polishing.
10. Building Services: 
Water supply, sanitation and drainage works, electric supply work and construction of cupboards and show cases constitute major building services.
For storing water from municipal supply or from tanker a sump is built in the house property near street. From the sump water is pumped to over head tanks placed on or above roof level so as to get water all the 24 hours. Plumbing work is made so as to get water in kitchen, bathrooms, water closets, sinks and garden taps.
For draining rain water from roofs, down take pipes of at least 100 mm diameters should be used. Proper slopes should be given to roof towards down take pipe. These pipes should be fixed at 10 to 15 mm below the roof surface so that rain water is directed to the down take pipe easily.
The sanitary fittings are to be connected to stone ware pipes with suitable traps and chambers.
Stone ware pipes are then connected to underground drainage of municipal lines or to the septic tank.
Many carpentry works are required for building service. They are in the form of showcases, cupboards, racks etc.
Electric supply is essential part of building services. The building should be provided with sufficient points for supply of lights, fans and other electric gadgets.

Comments

Popular posts from this blog

Hardy slab and where it use

  HARDY SLAB :- These kind of slabs are generally seen in Dubai and China. This  slab is constructed by hardy Bricks. Hardy bricks are hollow bricks and made up of concrete Hollow blocks are used to fill portions of the slab thickness it saves the  amount of concrete and hence the own weight of the slab is reduced. This kind of slab has a more thickness when compared with the conventional one. The thickness of hardy slab is 0.27m. The method of installing Hardy slab is different from normal  and it is clearly explained below: This is a one of the types of concrete slabs. The dimensions of Hardy brick is 40cm x 20cm x 20cm The process of execution is as follows: Step 1   : Formwork is arranged and then shutters are fixed on the formwork. Step 2  : Hardy blocks are placed on the shutter with one brick gap on the entire shutter. Step 3  : The gaps between the bricks are called as rib. Reinforcement is provided in a form of beam within the gap. Step 4  : After placing the

About slump cone test in concrete

Concrete Slump Test for Workability -Procedure and Results. Concrete slump test is to determine the workability or consistency of concrete mix prepared at the laboratory or the construction site during the progress of the work. Procedure for Concrete Slump Test: Clean the internal surface of the mould and apply oil. Place the mould on a smooth horizontal non- porous base plate. Fill the mould with the prepared concrete mix in 4 approximately equal layers. Tamp each layer with 25 strokes of the rounded end of the tamping rod in a uniform manner over the cross section of the mould. For the subsequent layers, the tamping should penetrate into the underlying layer. Remove the excess concrete and level the surface with a trowel. Clean away the mortar or water leaked out between the mould and the base plate. Raise the mould from the concrete immediately and slowly in vertical direction. Measure the slump as the difference between the height of the mould and that of height poin

About Dome,Pitch roof,Arches slab

Dome Slab:- These kind of slab is generally constructed in temples, Mosques, palaces etc. And Dome slab is built on conventional slab. Thickness of Dome slab is 0.15m. Domes are in semi circle and shuttering is done on conventional slab in dome shape and concrete is filled in shuttering forming dome shapes. This is a one of the types of concrete slabs. PITCH ROOF SLAB: Pitch roof is an inclined slab , generally constructed on resorts for a natural look. Compared to traditional roofing materials Tile-sheets used in pitch roof slab  are extreamely lightweight. This weight saving reduces the timber or steel structural requirements resulting in significant cost savings.Tile-sheets are tailor made for each project offering labour cost savings and reduced site wastage. And the thickness of slab is depends on the tiles we using it may be 2″-8″. This is a one of the types of concrete slabs. Advantages : 1. It sheds off rain water better. 2. It gives you internal storage or ro